Advertisement
  • In connection with the situation with  coronavirus the meetings of the ACS department are held in the online mode "Conferences on the ZOOM platform".

Annotation to the degree project of the student Volkov

Explanatory report to bachelor diploma «system processing, commutation and coordination signal modern navigation system to the board military airplane Sy-27 » has pages with text, tables, graphics, Reference to literature.

Work goals are integrated modern navigation system to the board military airplane Sy-27 and made to transformation coordinate plane between systems coordinate WGS-84 and SC-42.

Result which is had by we. Method how integration modern navigation system to board military airplane. How device C-060 is changed for new navigation system and method transformation coordinate object between WGS-84 and SC-42 with high accuracy.

That result will be published at delivery of bachelor diploma work by me.

Keywords: integration, Sy-27, WGS-84, SC-42,Gelmert’s transformation, Molodetskiy’s transformation.

Address 03056, Kyiv, st. Botkin 1, NTUU "Igor Sikorsky Kyiv Polytechnic Institute"

The housing 28, room 308

Telephone +380 44 204 83 17